51303

Daund - Kalaburagi Fast Passenger

51303/Daund - Kalaburagi Fast Passenger (UnReserved)दौंड - कलबुरगि फास्ट पैसेंजर
PassengerCR↔ 51304
51303 Daund - Kalaburagi Fast Passenger photo 151303 Daund - Kalaburagi Fast Passenger photo 251303 Daund - Kalaburagi Fast Passenger photo 351303 Daund - Kalaburagi Fast Passenger photo 451303 Daund - Kalaburagi Fast Passenger photo 551303 Daund - Kalaburagi Fast Passenger photo 651303 Daund - Kalaburagi Fast Passenger photo 751303 Daund - Kalaburagi Fast Passenger photo 8 1 / 8
Representative gallery slideshow
Departure
DD
DAUND JN
05:00
Sun, 16 Aug
06 hr 20 minDuration
301 kmDistance
47 km/hAvg speed
16Stops
Arrival
KLBG
KALABURAGI
11:20
Sun, 16 Aug
06 hr 20 minDuration
301 kmDistance
47 km/hAvg speed
16Stops
Rake & maintenance
ICF · 12 coaches · 1 rake PM: KLBG (CR)
Travel classes
Runs on
ThuSun
Running
Of 16 Aug, has arrived at Kalaburagi at 11:40 (20 min late).
Mostly spotted with WAP7 / Visakhapatnam Loco link
WAP7 locomotive

Composition

PLANNED
12 Coaches
0
L
1
GEN
2
GEN
3
GEN
4
GEN
5
GEN
6
GEN
7
GEN
8
GEN
9
GEN
10
GEN
11
SLR
12
SLR

37 Stations

Loading crossings & overtakes...
Station
Timings
PF
Dist
DAUND JN (DD)
05:00
Pf4
0 km
2 non-stop stations · 27.7 km at 57 km/hr
BHIGWAN (BGVN)
05:29 - 05:30
-
27.68 km
1 non-stop station · 21.4 km at 64 km/hr
KETTUR (KEU)
05:50 - 05:52
-
49.07 km
2 non-stop stations · 25.7 km at 53 km/hr
JEUR (JEUR)
06:21 - 06:23
-
74.76 km
1 non-stop station · 16.1 km at 57 km/hr
KEM (KEM)
06:40 - 06:42
-
90.82 km
1 non-stop station · 18.3 km at 46 km/hr
KURDUVADI JN. (KWV)
07:06 - 07:08
Pf3
109.10 km
1 non-stop station · 15.8 km at 50 km/hr
MADHA (MA)
07:27 - 07:28
-
124.89 km
3 non-stop stations · 29.8 km at 54 km/hr
MOHOL (MO)
08:01 - 08:02
-
154.68 km
3 non-stop stations · 33.1 km at 47 km/hr
SOLAPUR JN (SUR)
08:44 - 08:49
Pf3
187.79 km
TIKEKARWADI (TKWD)
09:01 - 09:02
-
194.80 km
HOTGI (HG)
09:09 - 09:10
-
202.86 km
1 non-stop station · 20.3 km at 81 km/hr
AKALKOT ROAD (AKOR)
09:25 - 09:27
-
223.19 km
1 non-stop station · 14.1 km at 77 km/hr
BOROTI (BOT)
09:38 - 09:39
-
237.29 km
DUDHANI (DUD)
09:49 - 09:50
-
250.95 km
2 non-stop stations · 23.2 km at 77 km/hr
GANAGAPUR ROAD (GUR)
10:08 - 10:09
-
274.14 km
3 non-stop stations · 26.7 km at 23 km/hr
KALABURAGI (KLBG)
11:20
-
300.79 km

Train FAQs

What is the schedule of Daund - Kalaburagi Fast Passenger (51303)?

Daund - Kalaburagi Fast Passenger (51303) runs from DAUND JN to KALABURAGI. Check the timetable above for every scheduled stop.

What is the route of Daund - Kalaburagi Fast Passenger (51303)?

Daund - Kalaburagi Fast Passenger (51303) connects DAUND JN and KALABURAGI. The complete stop-by-stop route is listed in the timetable above.

On which days does Daund - Kalaburagi Fast Passenger (51303) run?

Daund - Kalaburagi Fast Passenger (51303) runs on Thu, Sun.

What is the coach composition of Daund - Kalaburagi Fast Passenger (51303)?

The composition section above shows 12 coaches for Daund - Kalaburagi Fast Passenger (51303).