58503

Bhawanipatna - Visakhapatnam Passenger

भवानीपाटणा - विशाखपट्टणम पैसेंजर
PassengerSCOR↔ 58504
58503 Bhawanipatna - Visakhapatnam Passenger photo 1
Departure
BWIP
BHAWANIPATNA
01:15
Thu, 20 Aug
09 hr 05 minDuration
308 kmDistance
34 km/hAvg speed
34Stops
Arrival
VSKP
VISAKHAPATNAM
10:20
Thu, 20 Aug
09 hr 05 minDuration
308 kmDistance
34 km/hAvg speed
34Stops
Rake & maintenance
ICF · 12 coaches · 1 rake PM: VSKP (SCOR)
Travel classes
Runs on
MonTueWedThuFriSatSun
Running
Of 20 Aug, has departed Muniguda at 03:39 (19 min late).
Lately spotted with WAG9HC / Pune Loco link
WAG9HC locomotive

Composition

CURRENT
12 Coaches
0
L
1
SLRD
2
GEN
3
GEN
4
GEN
5
GEN
6
GEN
7
GEN
8
GEN
9
GEN
10
GEN
11
GEN
12
SLRD

36 Stations

Loading crossings & overtakes...
Station
Timings
PF
Dist
BHAWANIPATNA (BWIP)
01:15
Pf1
0 km
DEPUR PH [D] (DPUR)
01:33 - 01:34
Pf1*
12.93 km
G.RAMACHANDRAPUR PH [D] (GRCP)
01:46 - 01:47
Pf1*
21.22 km
LANJIGARH ROAD (LJR)
02:00 - 02:01
Pf1
30.25 km
AMBODALA (AMB)
02:11 - 02:12
Pf1
43.85 km
DOIKALLU (DKLU)
02:30 - 02:57
Pf1
55.65 km
MUNIGUDA (MNGD)
03:18 - 03:20
Pf1
68.85 km
BISSAMCUTTACK (BMCK)
03:55 - 04:40
Pf1*
85.85 km
THERUBALI (THV)
05:12 - 05:13
Pf1*
104.35 km
SINGAPUR ROAD (SPRD) (SPRD)
05:43 - 05:44
Pf1*
113.55 km
RAYAGADA (RGDA)
05:55 - 06:00
Pf4*
122.78 km
LADDA (LDX)
06:10 - 06:11
Pf2*
130.60 km
JIMIDIPETA (JMPT)
06:18 - 06:19
Pf2*
137.78 km
KUNERU (KNRT)
06:32 - 06:33
Pf2*
146.92 km
GUMADA (GMDA)
06:41 - 06:42
Pf3*
155.71 km
PARVATIPURAM TN [D] (PVPT)
06:54 - 06:55
Pf*
167.65 km
PARVATIPURAM (PVP)
06:58 - 07:00
Pf3*
169.30 km
NARSIPURAM HALT [D] (NSX)
07:05 - 07:06
Pf*
173.72 km
SITANAGARAM (SNM)
07:13 - 07:14
Pf3*
182.10 km
BOBBILI (VBL)
07:28 - 07:30
Pf3*
193.37 km
DONKINAVALASA (DNV)
07:41 - 07:42
Pf2*
205.33 km
KOMATIPALLI (KMX)
07:51 - 07:52
Pf3*
215.15 km
GAJAPATINAGARAM (GPI)
08:00 - 08:01
Pf1*
224.71 km
GARUDUBILLI (GRBL)
08:10 - 08:11
Pf1*
235.22 km
GOTLAM (GTLM)
08:17 - 08:18
Pf1*
241.08 km
VIZIANAGRAM JN (VZM)
08:35 - 08:40
Pf2*
246.72 km
KORUKONDA (KUK)
08:50 - 08:51
Pf2*
257.37 km
ALAMANDA (ALM)
08:57 - 08:58
Pf4*
264.48 km
KANTAKAPALLE (KPL)
09:06 - 09:07
Pf4*
273.71 km
KOTTAVALASA (KTV)
09:16 - 09:17
Pf2*
281.45 km
PENDURTI (PDT)
09:24 - 09:25
Pf2*
290.37 km
1 non-stop station · 9.2 km at 50 km/hr
SIMHACHALAM [D] (SCM)
09:36 - 09:38
Pf1*
299.61 km
1 non-stop station · 3.3 km at 33 km/hr
MARRI PALEM HALT [D] (MIPM)
09:44 - 09:45
Pf*
302.89 km
VISAKHAPATNAM (VSKP)
10:20
Pf5*
307.51 km

Train FAQs

What is the schedule of Bhawanipatna - Visakhapatnam Passenger (58503)?

Bhawanipatna - Visakhapatnam Passenger (58503) runs from BHAWANIPATNA to VISAKHAPATNAM. Check the timetable above for every scheduled stop.

What is the route of Bhawanipatna - Visakhapatnam Passenger (58503)?

Bhawanipatna - Visakhapatnam Passenger (58503) connects BHAWANIPATNA and VISAKHAPATNAM. The complete stop-by-stop route is listed in the timetable above.

On which days does Bhawanipatna - Visakhapatnam Passenger (58503) run?

Bhawanipatna - Visakhapatnam Passenger (58503) runs on Mon, Tue, Wed, Thu, Fri, Sat, Sun.

What is the coach composition of Bhawanipatna - Visakhapatnam Passenger (58503)?

The composition section above shows 12 coaches for Bhawanipatna - Visakhapatnam Passenger (58503).