25014

Corbett Park Link Express

कॉर्बेट पार्क लिंक एक्सप्रेस
Mail/ExpressNER↔ 25013
25014 Corbett Park Link Express photo 125014 Corbett Park Link Express photo 225014 Corbett Park Link Express photo 325014 Corbett Park Link Express photo 425014 Corbett Park Link Express photo 525014 Corbett Park Link Express photo 625014 Corbett Park Link Express photo 725014 Corbett Park Link Express photo 8 1 / 8
Representative gallery slideshow
Departure
RMR
RAMNAGAR
22:25
Tue, 18 Aug
01 hr 39 minDuration
76 kmDistance
46 km/hAvg speed
3Stops
Arrival
MB
MORADABAD
00:04
Wed, 19 Aug
01 hr 39 minDuration
76 kmDistance
46 km/hAvg speed
3Stops
Rake & maintenance
ICF · 7 coaches · 1 rake PM: KGM (NER)
Travel classes
SL3A2A2S
Runs on
MonTueWedThuFriSatSun
Running
Of 18 Aug, has arrived at Moradabad at 00:05 (1 min late).
Mostly spotted with WAP4 / Izzatnagar Loco link
WAP4 locomotive

Composition

CURRENT
7 Coaches
0
L
1
D1
2
S2
3
S1
4
AB1
5
B1
6
D2
7
SLRD

13 Stations

Loading crossings & overtakes...
Station
Timings
PF
Dist
RAMNAGAR (RMR)
22:25
Pf1*
0 km
2 non-stop stations · 27.4 km at 61 km/hr
KASHIPUR (KPV)
22:52 - 22:57
Pf1*
27.36 km
8 non-stop stations · 49.1 km at 44 km/hr
MORADABAD (MB)
00:04
Pf4*
76.42 km

Train FAQs

What is the schedule of Corbett Park Link Express (25014)?

Corbett Park Link Express (25014) runs from RAMNAGAR to MORADABAD. Check the timetable above for every scheduled stop.

What is the route of Corbett Park Link Express (25014)?

Corbett Park Link Express (25014) connects RAMNAGAR and MORADABAD. The complete stop-by-stop route is listed in the timetable above.

On which days does Corbett Park Link Express (25014) run?

Corbett Park Link Express (25014) runs on Mon, Tue, Wed, Thu, Fri, Sat, Sun.

What is the coach composition of Corbett Park Link Express (25014)?

The composition section above shows 7 coaches for Corbett Park Link Express (25014).