12761

Tirupati - Karimnagar SF Express

तिरुपति - करीमनगर सुपरफास्ट एक्सप्रेस
Superfast ExpressSCR↔ 12762
12761 Tirupati - Karimnagar SF Express photo 112761 Tirupati - Karimnagar SF Express photo 212761 Tirupati - Karimnagar SF Express photo 312761 Tirupati - Karimnagar SF Express photo 412761 Tirupati - Karimnagar SF Express photo 512761 Tirupati - Karimnagar SF Express photo 612761 Tirupati - Karimnagar SF Express photo 712761 Tirupati - Karimnagar SF Express photo 8 1 / 8
Representative gallery slideshow
Departure
TPTY
TIRUPATI
20:05
Sat, 15 Aug
12 hr 35 minDuration
713 kmDistance
57 km/hAvg speed
12Stops
Arrival
KRMR
KARIMNAGAR
08:40
Sun, 16 Aug
12 hr 35 minDuration
713 kmDistance
57 km/hAvg speed
12Stops
Rake & maintenance
LHB · 22 coaches · 2 rakes PM: SC (SCR)
Travel classes
SL3A2A
Runs on
WedSat
Running
Of 15 Aug, has arrived at Karimnagar at 08:34 (On Time).
Mostly spotted with WAP7 / Lallaguda Loco link
WAP7 locomotive

Composition

CURRENT
22 Coaches
0
L
1
LPR
2
GEN
3
GEN
4
A1
5
A2
6
B1
7
B2
8
B3
9
B4
10
B5
11
B6
12
B7
13
S1
14
S2
15
S3
16
S4
17
S5
18
S6
19
S7
20
GEN
21
GEN
22
SLRD

101 Stations

Loading crossings & overtakes...
Station
Timings
PF
Dist
TIRUPATI (TPTY)
20:05
Pf*
0 km
1 non-stop station · 9.8 km at 26 km/hr
RENIGUNTA JN (RU)
20:28 - 20:30
Pf2*
09.79 km
2 non-stop stations · 23.2 km at 58 km/hr
SRI KALAHASTI (KHT)
20:54 - 20:55
Pf2*
32.99 km
5 non-stop stations · 60.0 km at 55 km/hr
GUDUR JN (GDR)
22:00 - 22:02
Pf4*
92.96 km
43 non-stop stations · 292.7 km at 75 km/hr
VIJAYAWADA JN (BZA)
01:57 - 02:07
Pf10*
385.67 km
9 non-stop stations · 56.9 km at 46 km/hr
MADHIRA (MDR)
03:21 - 03:22
Pf2*
442.53 km
5 non-stop stations · 44.4 km at 65 km/hr
KHAMMAM (KMT)
04:03 - 04:04
Pf2*
486.91 km
6 non-stop stations · 45.3 km at 60 km/hr
MAHBUBABAD (MABD)
04:49 - 04:50
Pf1*
532.24 km
6 non-stop stations · 60.2 km at 71 km/hr
WARANGAL (WL)
05:41 - 05:43
Pf2*
592.41 km
4 non-stop stations · 47.2 km at 81 km/hr
JAMIKUNTA (JMKT)
06:18 - 06:19
Pf1*
639.65 km
6 non-stop stations · 38.9 km at 56 km/hr
PEDDAPALLI (PDPL)
07:01 - 07:21
Pf1*
678.51 km
2 non-stop stations · 34.6 km at 26 km/hr
KARIMNAGAR (KRMR)
08:40
Pf1*
713.07 km

Train FAQs

What is the schedule of Tirupati - Karimnagar SF Express (12761)?

Tirupati - Karimnagar SF Express (12761) runs from TIRUPATI to KARIMNAGAR. Check the timetable above for every scheduled stop.

What is the route of Tirupati - Karimnagar SF Express (12761)?

Tirupati - Karimnagar SF Express (12761) connects TIRUPATI and KARIMNAGAR. The complete stop-by-stop route is listed in the timetable above.

On which days does Tirupati - Karimnagar SF Express (12761) run?

Tirupati - Karimnagar SF Express (12761) runs on Wed, Sat.

What is the coach composition of Tirupati - Karimnagar SF Express (12761)?

The composition section above shows 22 coaches for Tirupati - Karimnagar SF Express (12761).