00596

NTSK-GAYA FTR SPECIAL (00596)

नेव् तिन्सुक-गय फ्त्र् स्पेसल्
FTRNFR↔ 00595
00596 NTSK-GAYA FTR SPECIAL photo 100596 NTSK-GAYA FTR SPECIAL photo 200596 NTSK-GAYA FTR SPECIAL photo 300596 NTSK-GAYA FTR SPECIAL photo 400596 NTSK-GAYA FTR SPECIAL photo 500596 NTSK-GAYA FTR SPECIAL photo 600596 NTSK-GAYA FTR SPECIAL photo 700596 NTSK-GAYA FTR SPECIAL photo 8 1 / 8
Representative gallery slideshow
Departure
NTSK
KOLKATTA TERMINAL
18:45
36 hr 00 minDuration
1,352 kmDistance
38 km/hAvg speed
5Stops
Arrival
GAYA
NEW GUWAHATI G/SHED
06:45 +1 day
36 hr 00 minDuration
1,352 kmDistance
38 km/hAvg speed
5Stops
Rake & maintenance
ICF · 19 coaches · 1 rake PM: TSK (NFR)
Travel classes
GENSL
Runs on
Tue
Scheduled link Locomotive link
Open live map

Composition

PLANNED
19 Coaches
0
L
1
GEN
2
GEN
3
SLR
4
SLR
5
S1
6
S2
7
S3
8
S4
9
S5
10
S6
11
S7
12
S8
13
S9
14
S10
15
S11
16
S12
17
S13
18
S14
19
S15

7 halts · 157 non-stop stations

Loading crossings & overtakes...
Station
Timings
PF
Dist
KOLKATTA TERMINAL (KOAA)
10:00
PfMissing?
0 km
22 non-stop stations · 69.2 km at 38 km/hr
RANAGHAT JN (RHA)
11:50 - 12:10
Pf1
69.20 km
45 non-stop stations · 247.0 km at 38 km/hr
MALDA TOWN (MLDT)
18:35 - 18:55
Pf2
316.18 km
56 non-stop stations · 358.8 km at 40 km/hr
NEW COOCH BEHAR (NCB)
03:55 - 04:15
PfMissing?
674.96 km
20 non-stop stations · 172.5 km at 41 km/hr
BARPETA ROAD (BPRD)
08:30 - 08:50
PfMissing?
847.46 km
8 non-stop stations · 64.9 km at 39 km/hr
RANGIYA JN. (RNY)
10:30 - 10:50
PfMissing?
912.36 km
6 non-stop stations · 51.5 km at 34 km/hr
NEW GUWAHATI G/SHED (NGC)
12:20
PfMissing?
963.88 km

Review 00596 NTSK-GAYA FTR SPECIAL

Share helpful journey details with fellow travellers.

Stars

Traveller reviews

No ratings or reviews yet. Be the first to share your experience.

Train FAQs

What is the schedule of NTSK-GAYA FTR SPECIAL (00596)?

NTSK-GAYA FTR SPECIAL (00596) runs from KOLKATTA TERMINAL to NEW GUWAHATI G/SHED. Check the timetable above for every scheduled stop.

What is the route of NTSK-GAYA FTR SPECIAL (00596)?

NTSK-GAYA FTR SPECIAL (00596) connects KOLKATTA TERMINAL and NEW GUWAHATI G/SHED. The complete stop-by-stop route is listed in the timetable above.

On which days does NTSK-GAYA FTR SPECIAL (00596) run?

NTSK-GAYA FTR SPECIAL (00596) runs on Tue.

What is the coach composition of NTSK-GAYA FTR SPECIAL (00596)?

The composition section above shows 19 coaches for NTSK-GAYA FTR SPECIAL (00596).